Views: 0 Author: Site Editor Publish Time: 2026-11-07 Origin: Site
Model of purchased charging station:
Thunder 240kw charging station CCS2 gun head interface supports OCPP1.6J
Project scale
5 240kw charging stations
Problems faced
The customer had previously purchased Chinese made charging piles, and the equipment frequently overheated and shut down in the high temperature environment of Germany during the summer; Personnel are needed on site
Manually restarting the equipment, frequent malfunctions directly cause a decrease in station revenue, so we plan to replace the charging equipment with higher reliability.
How to solve problems
Our charging stations are equipped with high-quality green energy charging modules; Optimization of the internal structure of the equipment, using dedicated air ducts for heat dissipation
Significantly improve the heat dissipation capability in high-temperature environments. After the equipment was delivered and put into operation, there were no further occurrences of high-temperature overheating shutdown faults.
The value it brings
The equipment operates continuously, stably, and efficiently without any malfunctions, retaining old charging users at the station while continuously attracting new vehicles to the station for replenishment
Yes, the passenger flow at the station has been increased. At present, the customer plans to expand large-scale commercial charging stations and still prioritizes our equipment.
.
